-FOR THE JUNCTIONS BETWEEN ROUTES LINK THE MAIN AREA, AREA WITH THE RED RIVER DIKE ROAD IN PROJECTS ARE DESIGNED LANES CONNECTING PAWS UP.In the AREA of the INTERSECTION BETWEEN the ROAD 5 LASTED with INTERREGIONAL ROUTES (the ONLINE URBAN RAILWAY LAYOUT number 2), ACCORDING to the MASTER PLAN, the LEFT TURN LANES FROM ROUTE 5 was HELD at the RING BASIS TURNS to the North (in the GN). In the PERIOD AHEAD MAY HOLD YOUR LEFT TURN FROM ROUTE 5 RIGHT BUTTON on the GROUND (or UNDERGROUND), SHALL BE MADE ACCORDING TO INDIVIDUAL PROJECTS are APPROVED by the AUTHORITY.* JUNCTIONS BY: JUNCTIONS REMAINS IS THE INTERSECTION BY, -THE INTERSECTION BETWEEN THE LEVEL REGION TOGETHER IS THE MAJOR INTERSECTIONS, NEED DRIVER LIGHT LAYOUT TRAFFIC SIGNALS, THE NAVIGATION ISLAND. -The INTERSECTION BETWEEN ROUTES LEVEL AREAS with LOWER LEVELS of OTHER ROUTES to ENSURE DISTANCE BETWEEN THIS INTERSECTION FROM 250M UPWARDS. THE CASE DOES NOT MEET, ONLY ALLOW RIGHT TURN ON (OFF) FROM THE LOW-SPEED LANES CLOSE BUNCH OF SEAMS, DO NOT OPEN THE DIVIDER BETWEEN PAINT AND SIGNAGE, COMBINED TRAFFIC GUYS D/STATIC TRAFFIC:* PARKING: LAYOUT RULES:-PUBLIC PARKING NEEDS FOR THE RESEARCH AREA IS DETERMINED ON THE PRINCIPLE OF ENSURING ENOUGH PARKING FOR SELF NEEDS OF EACH TYPE OF PUBLIC WORKS, HOUSING CENTRAL RESIDENTIAL, HOUSES AND COTTAGES. AND TRANSACTIONAL NEEDS FROM ELSEWHERE TO THE PARKING TIME IS SHORT.-PUBLIC WORKS, MIXED HOUSING, CONDOMINIUM, VILLA ... To ENSURE the NEEDS of PARKING YOURSELF WORKS PRESCRIBED in the VIETNAM CONSTRUCTION STANDARDS and the VIETNAM CONSTRUCTION STANDARDS-TCXDVN 323:2004 (standard HIGH-RISE housing DESIGN) in the BASEMENT, FIRST FLOOR and V ƯỜN of EACH works, ¬ GUIDANCE of the BUILDING at NO. 1245/BXD-SCIENTIFIC ACTIVITIES on 24/6/2013.PARKING AREA:-The PUBLIC PARKING: ACCORDING to PLANNING URBAN AREAS the N8, the APPROVED PUBLIC PARKING is LOCATED in the UNIT LAND in MAINLY TRANSACTIONAL PARKING NEEDS and EXISTING NEIGHBORHOOD VILLAGE AREA to ENSURE the TARGET of 4% of the LAND AREA in total PUBLIC PARKING is PARKING 21 , With an AREA of ABOUT 103.168 square meters.-Based on LAND USE DATA of the PARKING NEEDS of the CONSTRUCTION is EQUIVALENT 979.426 PARKING 39,177 M2, TOTAL PARKING DEMAND were OUT HYBRIDS is about 15% of the DEMAND for PARKING RIGHT at the PARKING 127,751 EQUIVALENT WORKS (details SEE TABLE APPENDIX)-The CENTER for MULTIMEDIA TRANSPORT and bus: ACCORDING to the PLANNING SECTOR LAYOUT in the AREA, the N8 CENTRE for MULTIMEDIA TRANSPORT (ĐP) is LOCATED SOUTH of ROUTE 5, at the LOCATION of the JUNCTION BETWEEN the two URBAN RAILWAY No. 2 and no. 4 with about 3, 18HA and BUS TRANSFER POINT (TC) is LOCATED SOUTHEAST of the INTERSECTION of VĨNH NGỌC AREA (BETWEEN the ROAD BRIDGE TAN-AIRPORT with a 5 LINE STRETCHING), scale about 2, 53HA.* BUS STATION:-On the GOM of TAN LINE-ARTICLE CONTENT HAS the DISTANCE BETWEEN the BUS STATION ABOUT 500 m, at the LOCATION of the STATION of URBAN RAILWAY number 2 HAS the COMPUTER LINK BETWEEN BUS and RAIL in ORDER to MEET the PASSENGER'S TRAVEL is SHORT for , THE MOST CONVENIENT.-THE BUS STOP ON THE ROUTE TO LIÊN MAIN AREA AND THE AREA UNDER THE PRINCIPLE OF STATION LAYOUT: + VEHICLE BUS BUS on the MAIN ROAD HAVE CONTROL SIGNAL LIGHTS are ARRANGED the WAY JUNCTION at LEAST 20 m. The LENGTH of a BUS ROUTE, RUNS ONE DIRECTION at LEAST 20 m, on MANY DIRECTIONS is 40 m, a WIDTH of 3 m is BEN
đang được dịch, vui lòng đợi..
