The cost and time to deployThe total cost and duration of the project as follows:TT items made of funds (us $) duration(month/year)1 building outline estimate 1,000 1/8-1/9/20152 collect 4,000 data preparation 1/9-1/11/20153 investigate picnic 70,000 1/11/2015-1/2/20164 the investigation interviewed 40,000 1/2 – 1/3/20165 Analysis reviews, deal, 30,000 figures 1/3-1/5/20166 building the map type 32,000 1/5-1/9/20167 Take up and summarizing patterns in Lao Cai province 40,000 1/9/2016-2017 1/2/20,000 amassing 8 1/2-1/4/20179 draft report 5,000 1/4-1/6/201710 build 3,000 official report 1/7-1/8/2017 Total price: 245,000 (USD) 24 (months)
đang được dịch, vui lòng đợi..