Chiller room has three existing chillers. Plan is split 2 chillers that needs replacing from the system and take them out of the chiller room before putting new chiller into. In addition, The rest chiller needs connecting to the system to ensure the operation of the plant during the installation of the new chiller. Notably, This work should be completed in 24 h but also to ensure the strictly factory's procedures of the labor safety
đang được dịch, vui lòng đợi..