Operators must master mechanic operating procedures monitored clock speed potentiometer to adjust the water according to the specified time (in the table below) while always observing the drain slew What if there is a problem, there must disconnect right breaker.
- The water resistance control in sequence:
+ Disconnect breaker directly on the engine.
+ When enough time turning it off circuit breaker to stop the machine.
After finishing shaped sewer, sewer concrete taken from the staging gentle centrifugation by 10-ton crane systems, are protected and prepared the work of curing concrete pipes.
- Require operators achieve concrete 1520 m3 / shift.
- End production shift, interrupt voltage-bowl-cool, clean, shift handover after use, record the contents of the device status, number of operating hours.
* NOTE
-When turning the drain if if shows a lack of mortar, it can add grout how worker hearts full thickness flat design.
- When you're shooting or preparing to shoot if any outages over an hour, they must unload cement unauthorized cement rotary seal test new techniques are used. APPROVAL