- Although mentioned by many times and commitment during the meeting but to the present time delay SEAREFICO lot more items and backlog have not been implemented as follows:
1. On the drawing.
- Technical Drawings rooms still not the browser.
2. Materials:
- The shortage of materials but the lightning has yet to submit additional materials while the work was about to COFICO and Supervision consultant allowed temporary entry into, but so far no documents to proceed with the test collecting inputs.
- the electrical cabinet supplies apartment before the apartment electrical cabinets plastic casing but when importing goods to the construction site, the cabinet has yet to iron shell power supplies to this process.
3. On the schedule:
3.1. Tower 1:
- Level 4-9 still not repaired defect and drainage water testing
- Floor 9 gene has yet to hand over the country to build drainage tiling in the bathrooms.
- Floor 11-12 storey construction is not yet complete end to night MEPs to carry out installation and acceptance.
- Floor 12, 13, 14, even though a lot of records COFICO the scene about delayed handover to build walls but to this bowl is still no workers 18.07.2016 construction to handover.
- MEP for floors 12-16 in-progress in meeting commitments so far no construction workers continue to lag.
3.2. Tower 2
- Only 3-5 floors escaped water testing. 6-11 floors still not finished repairing the bridge positions, and the code was wrong size to conduct testing gen consoles building and tiling.
- On the floor installation for 7-11 MEP has yet to conduct implementation the night to finish the installation and acceptance.
- From 9- 11 not handing the genes for gene construction and paving.
- Floor 11,12,13 build consoles for Searefico wall tube wall construction, but to 18/7 this has yet to be handed over to build a wall fill (with records on the scene later than 30 days 42,47,50)
c. Landscape.
- The commitment of regional meetings end zone 2. 25-5 18-7 but so far there is no move SRF construction, continued late
- Zone 3 according to the progress of implementation 11/07/2016 18/7 to 25/8/2016, but so far there is no move SRF construction sector continued to lag
- zone 4 according to the construction progress 25.09.2016 11.07.2016. But so far 2/8 continued late.
- So the delays mentioned above but not increase human SRF and monitoring the progress of late as late.