Site Preservation: The Contractor shall conduct preservation and after the embankment is constructed at the request of the investor until the completion and acceptance of work.
Cleaning the school: During the fill material. Contractors always have to keep the surface of the roof does not block piled up all kinds of waste materials. Upon completion of the work the Contractor shall remove all construction equipment, surplus materials, waste from the scope of the embankment, the embankment ensure neat satisfies the request of the investor.
In dress with surrounding structures, pipelines and other equipment, the investor can specify the use of equipment and special methods