In the first floor (the way to the ground from about 50 m) level of exploitation is 246,000 m ³/day; the next floor (the ground more than 100 m) is 1,440 m ³/day
On the first floor (ie approximately 50 m above the ground) the level of exploitation is 246.000m³ / day; next floor (ground than 100m) is 1.440m³ / day