Reference Clause 8.2 [Time for completion] of the contract;
Ref Clause 3.3.2 [The reference embankment] Section 03 970 - Soft Soil Treatment of Technical Standards Project;
Pursuant to the real situation, the conditions Construction ground on construction sites, contractors have calculated and repeat schedule for soil treatment stages required. We are pleased to report to you some of the issues the Board is as follows:
As of this moment, the whole of paragraph Contractors took delivery of the work site are not eligible to make reference sections covering prescribed Clause 3.3.2 [The reference embankment] Section 03 970 - Soft Soil Treatment of Technical Standards project.
According to the technical requirements of the project, in the way of the need to carry out ground handling weak, time of construction, load and wait a minimum of 9 ~ settlement 10 months depending on the region. Time required for construction of the superstructure (drain, the substrate and the pavement, sidewalks, ...) minimum 6-8 months. Therefore, the time required for construction of the road in sections of background processing to a minimum of 15 ~ 18 months.
Accordingly, Contractor Consortium note the Investor that to complete the items works as designed and on time contracts, the work site in the region need soil treatment had to be handed over to the Contractor from the Contractor dated 02.01.2015 to progress the reference sections . Contractors will complete the reference on around 12/2015. Then, the segments need different soil treatment will be constructed early next month since 1/2016 and complete the whole time after 15-18 months (March - May 6/2017).
However, to has expired must be at least above ground (02/01/2015), the contractor has not received any ground segment qualified to make up the reference sections and some sections have not received ground eligibility is to wait. Therefore, if the reference embankment sections still applies, the Contractor shall be extended time to complete bid package or need to change the technical solution to handle background or construction contract to handle series of background weak ground without waiting paragraph reference embankment.