Large investments in 2016: -Paper factory Delivered Long: + Boiler system 20 tons reserve of about 11.8 billion. The fan and the pump's Rotor + lot a backup pump about 1 billion. + Hoses coasted system, dough about 1 billion. + Beach background material about Raising 1 billion + Repair costs 1300 batch: $ 87,000 + Tools, spare system coasted about 3 billion. -Packaging plants: + 2 automatic paper connector about 42,000 USD+ The early waves of A: about 116,000 USD+-Printer slotter cover paper Guide: 500,000,000 contract+ Screw compressor 37A: 230,000,000 Council+ Automatic stapling Machine: 40,000 USD
đang được dịch, vui lòng đợi..