To implement the project, Trungnam

To implement the project, Trungnam Group set up a compensation plan for 1.200 homes and more than 1.110 ha of crops belonging to 8 communes of Di Linh District and Lam Ha District. Until now, people have migrated to the area of resettlement and had a stable life. Especially, people have been facilitated to work in the construction of the project and had a stable income. The project has received the approval and support of local government as well as numerous citizens. At the peak time of the construction, Trungnam Group mobilizated more than 500 machines and 3000 workers, engineers, supervisors which were working all day all night despite the harsh weather to meet the intensity of pouring 4000 concrete m3/day. The Hydroelectric Dam Dong Nai II was built with a concrete structure having a length of 1 km, a height of 80 m, the volume of 281 million m3.
0/5000
Từ: -
Sang: -
Kết quả (Anh) 1: [Sao chép]
Sao chép!
To implement the project, the Trungnam Group set up a compensation plan for 1200 homes and more than 1110 ha of crops belonging to 8 communes of Di Linh District and Lam Ha District. Until now, people have migrated to the area of resettlement and had a stable life. Especially, people have been facilitated to work in the construction of the project and had a stable income. The project has received the approval and support of local government as well as numerous citizens. At the peak time of the construction, the Trungnam Group mobilizated more than 500 machines and 3000 workers, engineers, supervisors which were working all day all night despite the harsh weather to meet the intensity of pouring concrete 4000 m3/day. The Hydroelectric Dam Dong Nai II was built with a concrete structure having a length of 1 km, a height of 80 m, the volume of 281 million m3.
đang được dịch, vui lòng đợi..
Kết quả (Anh) 2:[Sao chép]
Sao chép!
To implements the project, set up a compensation Trungnam Group plan for 1,200 homes and 1,110 hectares of cropper hơn belonging to 8 communes of Di Linh District and Lam Ha District. Until now, the People have migrated to the area of ​​Resettlement and had a stable life. Especially, người được facilitated to work in the construction of the project and had a stable income. The project has received the approval and support of local government requirements as well as Numerous Citizens. At the peak time of the construction, Trungnam Group mobilizated hơn 500 machines and 3,000 workers, engineers, supervisors mà là all night working all day despite the weather to meet the intensity Harsh of pouring concrete 4000 m3 / day. The Hydroelectric Dam Dong Nai II was built with a concrete structure having a length of 1 km, a height of 80 m, the volume of 281 million m3.
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: