After checking the premises of construction at the location of the power lines go through, to works not influenced our contractor, comments as follows:1. position the bridge abutment A2 Slit lap vo district:-In this position, the electric lines go after reducing the load floor (with layout and coordinates attached), so the background should load cell lines are way to put up high with the lowest altitude of 10 m.