IV. Formwork STATION DESIGN - John NAIL
*. Chose the coffa used:
metal formwork company by Hoa Phat steel fabrication.
Ministry of formwork include:
IV.1.THIET DESIGN CONSTRUCTION MEASURES entertaining, Christmas
IV.1.1.Mat by structural foundation :
surface work including foundation types: nail M1: 1,43,81,5 (8cau event)
• nail M2: 3,43,81,5 (12cau event), M3: 3,45,81,5 (2cau event)
• nail M4 (hardware foundation walls): 5,43,81,5 (1cau event), M5: 7,23,8 1,5 (1cau event), M6: 6,35,81,5 (2cau event), M7: 7,25,81,5 (1cau event)
• nail Bracing G1: 4 , 2x0,50,9 (5 components), nail Bracing G2: 4,80,50,9 (5cau event), nail Bracing G3: 5,20,50,9 ( 5 components), nail Bracing G4: 3,70,50,9 (7 structures), nail Bracing G5: 40,50,9 (8 structures)
đang được dịch, vui lòng đợi..