Mr NingAccording to information from the folder carrier Sanko machine. then june, 10 2016 4 air will Knife Factory of Sanko Hueang. and this time came in on July,04,2016 professionals commisorning will pass from Sanko on: 04/07 to 16/07/2016 2016and from today on to: 04/07/2016 his side must do the work technical part 1-transfer of air put the machine,2-insert the new air panel 3-moving air outside Volpack 4-2-air & 6 sachet sanko line 7 through a different location 5-move the machine in position 5 front sachet Sanko sanko 6 & 7
đang được dịch, vui lòng đợi..