according to our meeting this morning,
we only ask you to resubmit drawings include:
- building wall drawings (with more details about the thickness of the walls), few details changed from the design.
- Version painted floor: we have additional requirements for the flooring of the previous location in the main
- with revised drawings ceiling (change mainly in room 13)
- the details of construction of concrete walls we still the same as the original design.
Please check the attached file.
đang được dịch, vui lòng đợi..