Factory rent is calculated from the day the party A party B for the factory console, according to the report on the delivery of workshops. Side B must pay the entire monthly factory rent along with other costs referred to in article 4 (4.2) to A party during the period from May 1 to June 5 monthly.
đang được dịch, vui lòng đợi..
