Notes:A. construction conditions:1. The investor pulled out, power supply and power strips to the location of the gas station generators according to drawings by the Petrolimex HP design.2. The owner of the water supply, fire-station location to provide Gas to connect HP Petrolimex Gas with water cooling system for pressure vessel of water required is: 5 kg/cm2 to 6 kg/cm2, (according to drawing HP Petrolimex provided).3. The owner is responsible for the construction of the gas station related: nail Turkish gas, air, steam, chemical veil House foundations bearing technology. Open gas depot fence, lightning arrester, Hao gas pipeline technology via ...4. During installation, the owner offered free water and electricity construction service temporarily.B. progress:1. profile design time is 10 days from when the two sides sign a contract and get advance times 1.2. time please browse previous FIRE PROTECTION construction appeals is 15 days from when the two sides signed the contract and get the advance times 1.3. time for FIRE FIGHTING gas station experience please is 15 days from when the plant improve hydrant for gas stations4. Thời gian lắp đặt trạm cung cấp gas là 30 ngày kể từ khi bên thi công nhận được mặt bằng thi công (móng bồn, nhà che máy hóa hơi, đường tạm để di chuyển bồn vào lắp đặt....) và điện nước tạm phục vụ thi công.C. Thanh toán:1. Trị giá trên không bao gồm thuế VAT, không bao gồm chi phí phát sinh khác do cơ quan cảnh sát PCCC yêu cầu.2. Hình thức thanh toán: Tạm ứng đợt 1: 40% sau khi ký hợp đồng, tạm ứng đợt 2: 40% sau khi cung cấp toàn bộ vật tư, thiết bị chính tới chân công trình, thanh toán đợt 3 : 20% sau khi nghiệm thu bàn giao đưa vào sử dụng.3. Bảo hành thiết bị: 12 tháng kể từ ngày nghiệm thu bàn giao đưa vào sử dụng ( hoặc sau 15 ngày tính từ ngày hoàn thiện công tác lắp đặt).D. Thời hạn báo giá:- Báo giá có hiệu lực trong vòng 15 ngày kể từ ngày báo giá.
đang được dịch, vui lòng đợi..