Reference:
- General Conditions of Contract Section 7.5. Refusal
- General Conditions of Contract, Section 7.6. Repair works
- Technical Standards Project, Part 1, Article 01 800 items - Quality Control of Contractors, Sub-Section 25. Notice of non-compliance
- Quality Management Plan Contractor, Section News Report non-compliance
- Results of experiments frequency material form sand drainage layer granules were gathered at the scene at the position 18 + 116 Ly ~ 18 + 162, with reference number 009-CLC / 2015 / CF offer June 10, 2015 was conducted by Field Laboratory LAS - XD 346
- Notice of Noncompliance of Engineers Contractors guide Reference CDMST2 / CW4A / 0094 Recommended June 17 2015 Contractors Lot aware of sand for drainage layer has employee-specific granular gathered at the scene at the 18 position Ly ~ 18 + 162 + 116, as mentioned above, does not comply with love Standardization Technical requirements of the project. Lo said material will be taken out of the Contractor in the shortest time prescribed under the supervision of Engineer Representative.
đang được dịch, vui lòng đợi..