WORK centrifugal machine operators * Business * When complete mold assemblies must check all bolts, ê cu see already cut yet. Check the entire gantry rotation, spindle, ensuring the ability to guide the material into the mold conveyor rotary proceed. - Check the status of devices, actuators, additional oil in the gearbox (if required), grease on the bearings, gears, gear spleen. - Check system safety, shielding parts, the threaded joints. The order operates: Must have professional divers operating on rig dial. - Close pressure-bowl-cool master, safety inspections of electrical systems, pressure-switch circuit breaker control circuits. - Load the data in the correct ratio of gradation, press the control button for the camera, all from 40 60 seconds, lift bucket to load data into the mixer, adjust enough water. Does the mix for 3-5 minutes mixing mortar to form concrete, grout is poured into reverse conveyor systems, conveyor from being put into reverse mortar vertical conveyors, vertical conveyors from the mortar strips are each layers into the mold shape is hung on staging sewer centrifugation, as the type of product that the difference in time and different rotational speed. * The speed of rotation of the gantry taken according to the following table:
đang được dịch, vui lòng đợi..