Based on the overall work progress update on 24-12-2014, the report on the work of mobilization of construction equipment, the commitment to detailed construction schedule has been submitted to contractors. After inspecting the scene TVGS has a number of comments prompted as follows:1-TRA NOC BridgeIn TRA NOC Bridge works progress of dismantling the old bridge is very slow progress, violations were committed to a big impact on the overall work progress especially the construction of bored piles. Counsel requested the contractor replenished rigs and tang construction time to catch up with the progress of construction projects and has committed.GS consultants require pile drilling equipment line stuffed in the abutment M1, T1-based coast tho was not allowed to move to another location without the consent of the Board of QLDA1 and supervising.-The complete volume is also category of phase 1 should be conducted immediately and urgently. This work must be completed on 3/2/2015 as required by the General Directorate of roads and Ban QLDA1.-Safety woes, traffic safety and environmental hygiene should be maintained and made better guarantees as required that the project was proposed.Color Bridge 1-The work of dismantling the old bridge section structural very slowly compared to the construction schedule was committed. Ask contractors to accelerate dismantling to be present by construction to serve construction of basement Foundation.-According to the overall work progress for ST1 will conduct drills stuffed into 10-1-2015 but so far stuffed drilling equipment, drilling and supply chain execution has not been raised to the school. Recommend contractors to explain in writing to the owner and TVGS about the delay mentioned above.-The way the bridge but were contractors conducting construction progress but do not meet the schedule. Suggest additional contractors more construction equipment, nose contest have pledged to make sure all the rest of phase 1 will be completed by September 2015-2-3.Bridge To White 2The work of demolishing concrete structures of the old bridge abutment head tho but has been deployed but the volume is still quite a lot. Recommend contractors to accelerate progress to ensure undisturbed to the bored piles construction progressBored piles construction lines have been deployed on the scene but have not conducted according to the construction plan. Contractor proposals urgently to increase construction construction schedule in order not to violate the time-Fund reserves have been identified in the overall work progress.-The volume of the line items required are also very much require contractors to have a specific plan to improve the remaining tasks before the 3-2-2015Above are some of TVGS's comments on the State of progress of the contractor. Ask the contractor replied in writing on the issues mentioned above at the latest on 14 h on 15/1/2015We wish the cooperation from the contractor
đang được dịch, vui lòng đợi..