Directive on the review and fix warnings ac-v1
based on the actual situation of the settlements petrol station grid for each month;
review of the proposed divisions and functions;
total NATCOM company director instructs the provincial branches and departments perform the following:
i. provincial branches.
1.perform repair and test run the generator warning for grid stations and attached the ac_v1, stations list as detailed annexes. completed before 31/12/2013.
2. report the completion of work (full scan hard copy signed by Director / Deputy gDcn) at each station electrical room and room for noc.completed before 31/12/2013.
Ii. Rooms mining techniques.
1. coordinate with the provincial branch shall declare warning lost power (ac off) and run the generator warning (generator tremor) on the system.
Focal supporting branches:
[email protected]. VN
sđt: 43980920
2.coordinate with the electrical room to Checked for data control of the provincial branch.
iii. Financial.
do not give the settlement petrol stations do not report warns connection ac-v1 p.co list that sends power through.
iv. mechanical and electrical rooms.
1. coordinating and guiding the branches in the implementation process.
Focal point branch support:
[email protected],
sđt: (509) 43322231
2. monitoring, the provincial executive branch implementation schedule and quality.
3. examine the results of implementation of the provincial branch.
4. synthetic data, sending p. financial statements the Directors daily company.
v. sanctions:
ki d for the director and deputy director in charge of technical implementation in accordance with directives.
received directives related departments to seriously implement. /.
General Manager