- Holder molding presses up: After installation is completed the mold, the mold mounting bolts on the ring, used for hoisting winch, presses the mold up. Align the stem silver spray nozzle fit. For molding presses on. Then, remove the ring bolts. Using cutting jig fixtures on the site.
- Getting water line system for mold: After boarding jig mold, machine control 2 separate cavity to ease the assembly line in the country. Turn mounting bolts on the water line. Young should wrap duct tape and glue waterproof to water does not leak when pressed. Then, attach the water hose and tighten with old goat.
- Installation of auxiliary parts: Installation of auxiliary parts (if any) on the site such as controller Hearter or water heaters, sensors, ...
- preparation of plastic material: the preparation of plastic materials have been calculated in advance through CAM, CAE, requirements of the order or nature of the product, ... plastic put into containers on the machine, then turn on the rules for plastic resin dryer.
- Check the water line: Turn the water line system for water flowing through the mold. If water leaks out, then to stop and fix the leak site until the end of dripping water is satisfactory.
- Injection test: After having prepared everything satisfactory, the next step is to try pressing operation presses well not. 2 pressed together cavity plastic injection to wait 15s, taking the product out and check whether the product is satisfactory.
- Reset All molding: After pressing test, if the unsatisfactory by molding parameters, process
operating parameters reset accordingly pressed through CAE and CAM simulation calculated. Then, perform forced back to test the product based on the requirements of the manufacturer and the technical requirements of CAD drawings in the process.
- Change the parameters of auxiliary parts to achieve love needs
of the customer.
- General check last product, if the product has to meet requirements, delivery, if unsatisfactory, perform redesign products.