Enslaved people be exceeding visiting overpass 3 storey fork HueMorning (24/3), works the other intersections varying Hue fork has "opened the door" for people to visit, admire.The pupils also enslave tingle on the tour worksFive more days, right on the 40-year anniversary of the liberation of Danang City (29/3/1975-29/3/2015), other intersections project level-3rd floor overpass junction hue (Danang) will inaugurate, by car. Currently the project has completed on the target. Have an appointment this morning (24/3), the Department of TRANSPORT to Da Nang and China Southern Group (of investors) has "opened the door" for the people of the city are to the take a tour of works. All the people on the tour are kept free. Other intersections project fork level Hue is located at the gateway to the North of Danang city, has a total investment of 2,000 billion, made in the form of BT in September 2013. The work consists of a 3 storey overpass. The ground floor for the branches turn not delivered with the railroad; the flyover on the first floor is the circular torus ring with branches in isolation; 2-floor overpass for priority direction from Hue to the central city of Danang and vice versa. The architectural highlight of this project is the Tower cable-stayed bridge parabola has two wire plane is located between the circular torus ring. Some pictures of the bridge crossed the 3 largest floor ready for inauguration day (29/3) to:The old man also insist descendants put cruise wasOverpass 3 floors seen from right wing Dien Bien Phu Street branchThe view from the top floor "the ground"From the third floor looking down the second floor and the ground floor torus ringSeen from left wing line Crazy Bien Phu branchView from 3rd floor overpass road wing ExpansionYet to date through the car, people still crowded the pull to visit bridges
đang được dịch, vui lòng đợi..
