After fully prepared materials and equipment installation will proceed the following steps.
Step 1: Remove the old equipment out, alignment and positioning cyclone in selected locations.
Step 2: Due to size duct necessary and outsourcing, cl and connect to the system as it is.
Step 3: Check and complete.