-The contract Price is adjusted when the additional work arising outside the scope of the contract was signed (in addition to the scope of work should follow the design and of this annex), or when A Party changing construction measures. When the workload incurred outside the contract was signed, the parties must establish annex arise, in which the need to define clearly the workload incurred and unit price applies
đang được dịch, vui lòng đợi..
