When the basement construction for high-rise buildings, a complex problem is construction of the pit dug deep in the cramped area related to the technical and environmental factors. Execution pits dug deep to alter the status of stress, deformation in the land around the area dug pits and can alter the soil, underground water levels leading to shift and can cause subsidence damaged neighboring buildings if there is no appropriate solution. The solution design, constructed primarily serves the stability into pits dug deep:
đang được dịch, vui lòng đợi..
