Article 10: acceptance, delivery of the equipment10.1 trials:10.1.1 experimental base currency: -The equipment is installed.-The equipment is operated, the test run.10.1.2 the duration test: party A and the A party consultant must complete and sign the minutes/records experience within 5 (five) days from the date the party B has announced the proposal.
đang được dịch, vui lòng đợi..