Dismantling of the formwork after the concrete has reached the intensity rule, must conduct a reasonable sequence and as directed by the technical staff. Regions must dismantle fences, signboards people and passing vehicles, prohibited by dismantling tore down and to take measures to prevent falling formwork. After dismantling formwork, conducting vulnerability shielding on the floor, do not put the work on the floor formwork, not thrown indiscriminately drop, clean and neatly classified formwork prescribed places