7-Dec
02 Turn on IPP room
lens Maintenance for C / M
Maintenance for dust collector No02
Continue modify the separation conveyor table at No.02 in separation room, not yet finish.
Check all work condition of equipments in polymerization oven (refrigerant, heater system, all sensors, SSR, door seal, belt
... etc) not yet finish
Adjustment N2 pressure for filling line04 0025 from 0:03 to
Replace battery for emergency light No20 & 04
Oven generator
U1 = 400 (V) Coolant temp. 146oF
U2 = 400 (V) Frequency = 50Hz
U3 = 400 (V) Oil pressure = 86PSI
UDC = 26.1 (VDC) Fuel = 1110 (L)
Utility generator
U1 = 400 (V) Coolant temp. 165 oF
U2 = 400V) Frequency = 50Hz
U3 = 400 (V) Oil pressure = 82 psi
UDC = 26.8 (VDC) Fuel = 800 (L)
Process chiller generator
U1 = 400 (V) Coolant temp. 66oC
U2 = 401V) Frequency = 50Hz
U3 = 400 (V) Oil pressure = 600 kpa
UDC = 26.1 (VDC) Fuel = 1145 (L)
IPP Storage temperature:
No. Temp (OC) Time
1 -16.0 13.30 "
-15.8 21h30 '
-16.3 5.30 '
2 off 1330 '
-1.2 21h30 '
-8.3 5.30 ' 8-Dec Filling C / MC line01 alarm was nozzle up / down alarm, check and repair already finish Adjustment N2 pressure for filling line04 0025 from 0:08 to Replace fan belt oven for No61 Continue modify the separation conveyor table at No.02 in separation room, not yet finish. Replace the ballast and lamp at the main office corridor Modify 15cm for tank at highter more as for mixing mixing request modify UV lamp as visual Support for visual request for AO Repair hand lifter motor dumper Replace oven at No10 IPP Storage temperature: No. Temp (OC) Time 1 -16.0 13.30 " -16.5 21h30 ' -16.3 5.30 ' 2 -14.5 13.30 " -15.3 21h30 ' -16.4 5.30 ' 9-Dec The vacuum part of Edging C / M No.22A working no good, already cleaning it. Edging C / M 13B cutter was holding alarm alarm, check and repair finish already Repair mold sheft at lotmake Continue modify the separation conveyor table at No.02 in separation room, not yet finish. Storage temperature IPP: No. Temp (OC) Time 1 -16.0 13.30 " -16.6 21h30 ' -16.3 5.30 ' 2 -14.5 13.30 " -15.5 21h30 ' -15.7 5.30 ' 10-Dec Continue modify the separation conveyor table at No.02 in separation room, not yet finish. Adjustment N2 pressure for filling line04 0085 from 0:09 to Replace sensor wire cable of filling nozzle A2 C / MC line04 Sumpit recycle pump gasket at C / M was choked up, already check and repair finish Replace seal for cylinder of mold CM No03 Modify support base for vaccum at polishing part C / M IPP Storage temperature: No. Temp (OC) Time 1 -16.5 13.30 " -16.2 21h30 ' -16.1 5.30 ' 2 -16.2 13.30 " -15.7 21h30 ' -15.7 5.30 ' 11-Dec Install ceiling light at room assembling Replace sensor output conveyor for filling line03 Modify sensor alarm kato oven fan belt for not yet cut finish at arm1 Adjustment clamp gasket C / M Replace battery for UPS filling C / M use for spare Continue modify the separation conveyor table at No.02 in separation room, already finish. The IPP Storage temperature: No . Temp (OC) Time 1 -16.6 13.30 " -16.3 21h30 ' -16.5 5.30 ' 2 -16.3 13.30 " -14.2 21h30 ' -15.7 5.30 ' 12-Dec Adjustment N2 pressure for filling line03 to 12:03 Adjustment for filling N2 pressure from 0:09 line04 to 0095 to 0.1 Lens C / M 01 was at lifter alarm input, check and repair finish already Install UV lamp at AO Adjustment N2 pressure for filling line04 0135 to 0085 from 0:12 to Replace new belt oven for No14 Chamfering C / M input conveyor was alarm, check and repair finish already 5S cleaning room ahu not yet finish IPP Storage temperature: No. Temp (OC) Time 1 -16.6 13.30 " -15.8 21h30 ' -15.7 5.30 ' 2 -16.3 13.30 " -16.3 21h30 ' -16.3 5.30 ' 13-Dec Maintenance Mold cleaning machine for No.03 - Continue replace the new base in dry area - Install sensor alarm rack fall down. - Replace sensor input lifter of Maintenance for filling C // M line04 - Checking the condition of sensor wire and cable at nozzle up / down sensor - Replace ups for machine A and input conveyor Install socket at mixing room No02 Replace compressor for recle methylens C / M 5S cleaning room ahu Replace limit swicth for input conveyor edging C / M 12A IPP Storage temperature: No. Temp (OC) Time 1 -16.6 13.30 " -16.2 21h30 ' -16.1 5.30 ' 2 -16.3 13.30 " -15.6 21h30 ' 5.30 -16.5 '