According to the TOR, the task will bid package 2 of the detailed design, construction drawings, and detailed cost estimates for the water supply system 2 representatives to serve a population of 10,000 people and 10,000 ÷ 5,000 ÷ 50,000 people to A sensitivity analysis of the technical specifications, selection of optimal parameters used in the design of the two systems should be based on 2 new projects in 8 provinces P4R
đang được dịch, vui lòng đợi..
