c/the intersections:* other junctions Costa:-within planning have combined other intersections between the bridge line reinforcement Tan-airport with route 5 (Vinh Ngoc and button with the Red River at the bridge-Tan with an area of around 313.000 m2 construction are under development.-the intersection between the level region and regional routes with the route of the main axis of the town is the other junctions, or directly to the core only allows traffic to enter the Strip way middlemen.
đang được dịch, vui lòng đợi..