Step 7: Insert the plate pushed in (if fitted using the company pushed companies pushed into the mounting plate latch simultaneously hold back).
Step 8: Install 4 springs and bearings 2
Step 9: Insert the latch plate to hold and 4 in
Step 10 : Insert plates and 4 bolts push link plates and plates full hold.
Step 11: Put on the clamping plates and 4 bolts linking mobile mold part
a result of the complete mold
đang được dịch, vui lòng đợi..
