1 / Construction time: From 30 to 35 days
2 / Duration of warranty: 12 months
3 / Payment Method: Divided into 3 stages
- Stage 1: After signing the contract, an advance of 30%
- Phase 2: after placement of the stone 5x7, finishing rolling advance another 40%
- last installment: after finishing construction of payment acceptance handover stopped.
đang được dịch, vui lòng đợi..
