To ensure the repair (for all the damage, belongs to the structure (such as wet wall cracks, a floor system, electricity, water, sewage) and maintenance and implementation of appropriate, will be of interest to the annual (05) days after receipt of the notice in B
đang được dịch, vui lòng đợi..