Based on the actual situation on the construction site, to minimize the time taken part in beating the pile for items (Tunnel open, open pit walls, flood walls and pump stations) and to save cost for the project, the contractor propose dropped a pile of burning box on the pile at the head contact with the machine si sneak linen pile and remain compressed against local steel mesh.
With the above proposal will not affect the quality of the pile as well as the technical requirements of the project but also accelerate the progress of implementation for items.