20. The management plan on build quality, occupational safety and health:1. management quality of construction plan-Construction plan+ Surface area by construction: construction premises is calculated such that the area enough material, machines and equipment at the as well as outside the field of construction;+ The equipment required to complete the work: each work needs to have the kind of different equipment depending on the work, the order of construction and construction conditions;+ Manpower required to complete the work: the human resources deployed must match for each stage and work to ensure the most productive and effective progress;+ The volume and types of chemicals, additives need to use in the field, such as: diesel, hydraulic oil, machine oil, chemicals, etc.+ Each construction stage, work was the contractor of construction measures approved by the supervising officer and project management CRSD.-Manage the quality input materials:The type of input materials before use check the quality certificate, export porcelain, types to which the contractor proposed in tenders and negotiated contracts. At the same time ask the Unit conducted experiments in test samples, the experimental results are compared with the current standard to evaluate or unsatisfactory.Specification and number of samples for the kind of hard data as follows:1. Cement:Applied standards: ISO 6260-1995:Each batch of cement is under 40 tons are required to take 2 samples, each sample of 20 kg to do experiments. Cement samples must be retrieved scattered in the sack in the repository, each covering 1 kg. Experiment 1 model and 11 patterns to confronting when necessary. During the period of 60 days if no complaints between the buyer and seller of cement on the experimental results, the laboratory procedures to cancel the Save template.When starting to enter the cement market representing party A, party B together packing sealed sample formed thereon and a sample sent to the laboratory to do experiments. Cement samples have to be to avoid the water sealed in, avoid the other chemicals, avoid high temperature and to dry. Each pilot must do at least 5 targets specified in table 1.Test votes is grounds for testing cement mixing ingredients and design of concrete and mortar.2. Sand for construction:-Applied standard: TCVN 1770-1986, TCXD 127-1985.-Construction sand was 4 types as follows: sand medium sand, sand, small, fine sand (check table).-Method of sampling the cat experiment: Just 100 m of sand took a sample with a volume of not less than 50 kg, get scattered in many different places in a sand pile of the same kind, to contribute back and mix well, and set thereon sampling, carried away the experiment.Results of experiments of sand is the basis for collecting sand and materials is the base level component design mixing concrete.3. Gravel (gravel) types used in concrete:Applied standards: ISO 1771-1986.a) macadam, gravel are classified into the following groups:Stone size 0, 5x1: particle size from 5-10 mm; Stone size particle size: rectangles from 10-20 mm; Stone 2x4 size: size of grain of 20-40 mm; 4x7 size: particle size stones from 40-70 mm.b) technical requirements:-Particle composition: for stone County is located in the component size contour levels are defined as follows: (check table) -The sampling method of gravel (gravel) experiment: For smaller 200m3 rock 2 prototypes with the volume of each sample taken according to table 7. Retrieved scattered in many different places in a pile of stones of the same kind, to contribute back to the mix, Pack, set the minutes of sampling, carried away the experiment.Results of experiments is the basis for stone collecting stone material, is to base the design of concrete mixing ingredients.4. Construction steel-Applied standard: TCVN 1651-1985, TCVN 6285-1997.-Steel building has many types: smooth, rounded steel steel hot-rolled, cold-rolled, burning, steel, steel sheets, steel plate .... construction steel is produced by many manufacturers have the mark on quality steel plants such as: Thai Nguyen Steel: TISCO;, steel-Australia: V-UC; steel-Born: NSV; Hoa Phat steel: DANI; steel-Italy: VIS; Steel-Welding: VSP. ...a) check the diameter reinforcement by weight: When put on the steel used to check the actual diameter of reinforcement as follows: Cut 1 to 1 m long steel segment loss test weight Q (grams), the diameter of the steel plant was calculated by the following formula: Dthực = 0, 43x √ Q (mm)b) Measure the diameter rebar Zebra (method determine the nominal diameter of the reinforced stripe): -Nominal diameter D of reinforcement steel Zebra equivalent of a nominal diameter of reinforcement steel smooth circular cross-section area equal. Area cross section, volume 1 m length of steel bar under nominal diameter with steel's own volume by 7, 85 g/cm3.-Take a right 1 m long steel template is selected in the batch of steel need to check, clean samples before weight and and determine the cross section. Use measuring equipment weight has broken ladders to determine (to 1/1000kg) to the form. -Cross-section area F (in cm2) of reinforcement are determined by volume and length in the form prescribed in TCVN1651:1995 according to the formula: F = Q/7, 85L.(Including: F is an area of cross-section of steel bar in cm2. Q is the volume of rebar pattern Zebra by g. L is the length of the sample in a separate volume is 7.85 cm. of steel in g/cm3. Compare the results with standard steel).-Determine the nominal diameter (two methods): + Defined by table method according to ISO 1724-1985 from F and Q have identified.+ Determining by the formula: D = √ 4F/3.14c) steel experiments:-Sampling and experiments of steel: for every batch of steel have volume < = 20 metric tons, should get 1 group prototypes to test, including all types of reinforcement steel in batch, each taking 12 long bars from 0, 5 m to 0, 8 m.-Physical-mechanical indicators when steel experiments: + Flow restrictions, limited durability;+ Elongation;+ The real diameter measure;+ Cold Bending;Results of experiments and tests of steel is the base to test steel building.In addition to the material mentioned above, there are other hard material again, buying constructions available as manufacturers of additives, geotextile, a box of rocks, concrete, ... been checking the certificate types, manufacturers have been approved in the tenders.-Laboratory quality control of structures, structures in the construction field1. Experimental checks on concrete structures a) sample casting of concrete experiments. (Concrete sample TCVN 4453-1995):-In the process of the construction of cadre supervision of the owner and the technical execution of the building contractor must take concrete form at the scene, the technical staff of the owner signed on stamps and pasting up the template immediately after casting the concrete sample medium (when the concrete is still wet). Concrete form plywood experiments in age from 7 to 28 days.-Each type of concrete structures have to grab a sample consisting of 3 members is retrieved at the same time in the same place as specified by ISO 3105-1993. Kindergarten 15x15x15cm in size. The number of nests was defined by mass as follows:+ For large blocks of concrete: for 500m3 retrieved 1 nest templates when the volume of concrete poured in a block larger than 1,000 sq. meters and 250 retrieved 01 nest templates when the volume of concrete poured in a block of less than 1000 m 3.+ For the big claws: for concrete 100 retrieved 01 nest templates but no less than a template for a foundation blocks.+ Concrete foundations for the machine to have a mass greater than the 50m3 pour 50 m3 retrieved 01 sample nest but still get a sample when the volume of less than 50m3.+ For frame structures, beams, floors for 20m3 retrieved 1 nest templates, but when the volume is less than then still have to get a template for each type of structure.+ For the other menu structure has less mass than then still have to take a sample.+ For concrete surface of highways, airport runways just 200m3 get 1 nest templates but if concrete volume less than 200m3, then still have to take a sample.b) laboratory methods directly on the structure.Applicable standards: Field testing method by concrete gun (test method by rebound gun), ultrasound, concrete drilling at the scene to test reviews, determine the intensity of concrete quality.2. check the test relief ground, secures the tight layers of the nail.-Check under the standard ISO 4037-87. -Laboratory test standard 22TCN02-22TCN03-71 and 79.-Each layer up 15-18 cm thick area up < = 300m2 test 01.3. Foundation classes testing experiments in the construction of highways.-Check the experiment of soil classes K nail tightly. Experimental checks on standard elasticity modul 22CN 211-95 for comparison with the design requirements.-1,000 sq. meters measure 3 point and across the line.
đang được dịch, vui lòng đợi..