According to the Ministry of transportation, high speed project, bien Hoa-Vung Tau designed to standard class A, highway design speed of 100-120 km/hour, the scale 4-8 lanes. full length online about 77, 87km, out of which 66, 05km high speed standard, left the the connection and the main streets of the town. The route connects with the road to avoid a route avoiding the city of bien Hoa, Vung Tau junction 6, 5 km. The last point at km 68 + 670-Phu Hoa-segment of Highway 51. The total investment of the whole project about 24.478 billion
đang được dịch, vui lòng đợi..