• Borrow pits for embankment material and the prepared sẽ investigated to submit all documents cần the Engineer for approval gồm soil sample taking and testing printed at borrows pit laboratory and the like.
• The Contractor will Mobilize Equipment and Materials to site.
• The compaction will Be Carried out using the proposed equipment and methods approved by the Engineer statement.
• Before starting work on site embankment, the Contractor will lập control point system to support for embankment works. Existing ground surveyed by The Contractor Will Be Confirmed by The Engineer printing and writing.
• Temporary access shall only be made sau the correct sequencing of work execution.
• The workers will be briefed about safety matters.
• Communication on Site Will Be Conducted via mobile phones walkie-talkies and