4. After the final design documents are approved, the Purchaser shall submit the final design dossier together Table construction schedule for the Seller. During the construction process arising out of the change in comparison with the approved content, the Buyer committed to get re-approved decision first and then continue construction. 5. All workers and those with related interior construction units must be tagged by the Seller at the working level. 6. All act as electrical connection and drainage in a drain system that is unauthorized or discarded construction waste at public sector would be considered violations of this Guideline. In addition, during construction arising out of loss, damage to public areas or for other residents, the Acquiror with Construction unit must be completely responsible, and must comply unconditionally to the relevant directive from the Seller. 7. Buyer needs to clean up garbage in the construction process. In the event that the Purchaser does not implement this provision, the Seller will deduct the cost of a deposit on the construction.
đang được dịch, vui lòng đợi..