To the operation of the power system are effective. Thang Long co., Ltd. II recommended glass power company Hung Yen held the certification test, operate the times 2 for 3 (three) comrades have not yet satisfactorily completing inspection times 1 during the period from August 18/7/2016-22/7/2016. 3 (three) members named in annex 3 (attached).
đang được dịch, vui lòng đợi..
