Wastewater treatment systems E. land in Trang Bang from 04/2015. From April 4 to April 8 normal operating system, waste water is within permitted limits. But, 9.10, the excess waste water permit and the company e. land to pay for the cost of wastewater Infrastructure companies exceeded that level (9/targets specific Ammonium = 12.5 mg/l beyond 1.25 times = was 8,125/m3 sewage = 21,843,250; October upon solid target = 5.08 times exceeds 508m/l = m3nước 82,777,838 = waste/33.020). Although the company e. land in Trang Bang sent the written explanation, please take back waste water samples, please Lower Frequency company wastewater treatment fee support .... but still not be supported because the infrastructure must also submit wastewater treatment fee for State agencies.According to the situation as on the gentler please suggest with the company would be treated as follows: As a precaution, avoid waste water case goes beyond the norm, takes charge of the professional 01người, track to timely processing of wastewater or sewage incident goes beyond the norm. Like, the company does not cost much for the disposal of sewage. Please also report more current, 4 e. factory land (Cu Chi district, Binh Duong and Long An, Trang Bang) then the 03 factory: Cu Chi, Long An, Binh Duong, do not cook at the company (bring food home cooked, available in the company) should always lay in waste water limits allow, not to be crossed. Private only E. land in Trang Bang have cooking for the workers in the company should the sewage was always high, if the negligence, untimely processing are very susceptible to beyond the norm. This is a very big problem, affecting the cost of production, operation of e. land in Trang Bang. So look forward to the timely support from the Board of Directors of the company to reduce output costs. Best regards./.
đang được dịch, vui lòng đợi..