If the output of the work during the test run, according to ... lower the guaranteed value, as stated in paragraph 3.1 above, but not lower than the minimum value in paragraph 4.3 below, and the selected contractor liable to punishment for the owner instead of editing systems, devices to reach guaranteed parameters as stated in article ... , then the contractor shall incur a penalty at ___ for each 1% yield shortfall, or corresponding fines reduced levels in proportion to any shortfall would lower than 1%.