With the thickness offset weak proposal is 0, 30 m high, then finishing of lot 1 covers an area of 50 m2 159.70, will an elevation leveling + 2.50 m; lot 2 has an area of 20, 418.33 will at an elevation leveling m2 + 2.90 m
đang được dịch, vui lòng đợi..
