A 4-room cell. Inside this room you do row 4 from the basement to 8th floor .. Suite opposite always do the parking. Cellar system water. Above is the technical room. 4 basement room rental can be for those who are related to the security of the building and parking, protection and so on. Flat roof (of reinforced concrete Pour mandatory under the provisions of tall buildings category solidly grade 3) Design Foundation I (compulsory) should plan reinforced concrete columns reinforced with 250 x 250 full load injection. 300 x 500 nail comprehensive tape.
Funding build disaggregated by each item, depending on the investment rate and the types of materials they are attached side table construction QUOTATION company to his brother take comfort tracking survey and calculate
the execution time from the time he pressed concrete piles to handover completion is 8 months. (Risk ratio, the delay is 10 days)
In the draft table. Place the door, bathroom, kitchen. mezzanine proportion allocated according to Feng Shui review. Kitchens are working location for each age of the tenant. Therefore, you should use the stove with iron frame - Inox as 1 61 x 107x82 cm table is enough
I need counseling more detailed information. technical drawings, permit, construct his appointment letter after
he regards
KTS Le Duy Hanh
Co. building design Duy Phat Hanh
Phu - Thuan An - Binh Duong
D A. 0943 91928
BUILDING CONTRACTORS HAPPY PLAY ONLY - BRACKET HOUSING CONSTRUCTION
The rates below only refer to investors and financial planning. Contracted unit prices are determined when the complete design documents, with the agreement and discussions between the investors and our detailed volume, types of materials as well as the work assigned, we will be the official quotation is attached under the tender contract.
I have a plot area of 8x30m in Tan Binh District. Now I want to invest inn scale nghiep.Yeu bridge: 60 rooms, scheduled 8 floors, 1 basement.
communal rooms airy, with windows - mezzanine - toilet tiêng - hob mini - internet - Cable TV. Medium lift cargo and load up to 5 users who travel together. Each floor features a private collection. Basement parking underground water tank containing water. 1m5 corridor. Copper pipes, air-conditioned waiting rooms. Fire alarm systems and system room fighting each floor
of my land as I learned when applying GPXD catch back up to 2 m and 3 m back then.
Now I do not know how to design reasonable. The total construction cost is how much of each item: Workers - raw materials and component packages. Total construction time is how many months into using it.
I want to ask through you, sister architect design consultancy to help me. I believe in feng shui, brother, sister KTS feng shui consultant to help me!
I sincerely thank you.
Design feng shui is necessary to measure the direction of the land and see the date of birth, gender landlord.
Land Her home, the prescribed density of construction is 78% sister building, the rest do courtyard, skylights. Construction costs are 2.2 billion workers, raw materials are 5 billion, finishing supplies 3 billion, lift about 600 million.
For the ventilation and light, in addition to the backyard, she should do the skylights in scope stairs for convenient air convection, airy rooms, rooftop skylight roofing plate she took breakfast to the room receives natural light. Such design will save much cost using electricity for air conditioning, fan, lights.
Private foundations superstructure could you do pile, the pile would cost design actual geological her home. Cost estimates part of this pile of about 500 million.
The yard, fence gate will nail separation unit main blocks to avoid uneven subsidence and cause tearing wall. Part yard, fence gate wall 100 million.
Total package you need about 11.4 billion estimate. Construction time from start of her house until completion of 6 months. Her house sequence should proceed as follows: initial design release premises, construction permits, detailed designs and technical drawings simultaneously with construction permits, get a license and then, to the selected date Her groundbreaking offerings and begin construction, until the completion of the house, you enter all property offered.
Regarding construction materials, there will be tables detailing all materials used for attachment to the contract sisters construction, based on the description of the materials used, you can adjust up or down the types of materials to suit the needs and investment costs of the family home. In addition, construction contracts attached tables also describe all construction work at her home so that she could keep track of the construction process.
A package investment rate saving the average investment rate Investment interest rate type of investment rather premium
raw construction supplies and labor inclusive (depending on size and application conditions) "2,600,000 VND / m2 -> 3,200,000 VND / m2" " 2,800,000 VND / m2 -> 3,400,000 VND / m2 "" 30.00.000 d / m2 -> 3,600,000 VND / m2 "" 3,000,000 VND / m2 -> 4,000,000 VND / m2 "
Supplies perfecting portion (depending on the types of materials to be selected), "600,000 VND / m2 ---> 1,200,000 VND / m2" "1,000,000 VND / m2 ---> 1,500,000 VND / m2" " 1,400,000 VND / m2 ---> 2,400,000 VND / m2 "" 1,800,000 VND / m2 or more
turnkey package. "3,200,000 VND / m2 ---> 4,500,000 VND / m2 "" 3,800,000 VND / m2 ---> 5,000,000 VND / m2 "" 4,500,000 VND / m2 ---> 6,500,000 VND / m2 "" 5,600,000 VND / m2 or more
B supplies Name investment rate saving investment rate average investment rate type pretty senior investment rate
of reinforced concrete piles, piles D250 by market by market Pile Pile on demand as required Pile
Sand background sealings, leveling sand leveling and backfilling sand debris, rubble sand leveling and backfilling sand debris, rubble
Sand Masonry, Concrete Cat Cat Mekong often type 1, type 1 Sand Golden Sand, Golden Sand Cat type 1, Golden sand
brick, nail brick tunnel complexes Saigon Dong Nai Dong Nai tunnel
Stone 1x2, 4x6 rock Hoa An, Dong Nai Hoa An, Dong Nai Hoa An, Dong Nai Hoa An, Dong Nai
Bituminous Concrete structures 200; 10 ± 2 cm Mark 250; 10 ± 2 cm Mark 250; 10 ± 2 cm Mark 250; 10 ± 2 cm
Cotec Cement, Holcim Ha Tien, Ha Tien Holcim, Ha Tien Holcim, Holcim
South Vietnam Steel construction Australia - Pomina Vietnam Vietnam Japanese Japanese
automakers mortar 50-75 Mac Mac Mac 50-75 50-75 50-75 Mac
drainage pipes Dawn Dawn - Type 1 Vinaconex, Vespo Vinaconex, Vespo
hot water supply pipes Vertu Vinaconex Vinaconex, Vespo Vinaconex, Vespo
Empire sound Sino electric tube, Sino Chengli, Chengli, Clipsal Pana
Cadivi Cadivi Cadivi Cadivi Wire
Rope TV, phone, internet 5C, Sino, Krone 5C, Sino, Krone 5C, Sino, Krone 5C, Sino, Krone
C object name saving private investment rate investment rate average investment rate type pretty senior investment rate
Joton Joton wall ICI waste powder Putty Putty ICI
TOA Paint Maxilite Nippon, Dulux Dulux
background Bricks, tiles Taicera White Horse (White Horse) Euro tile, tile Euro Dong Tam, Vietnamese ceramic
granite <650,000 VND / m2 Black Hue, Binh Dinh Kim sa Red, Red Ruby imported
Lancan stairs, balconies, Iron box, iron box Oil Expo, Expo Inox Oil glass toughened glass toughened Inox
Railings Iron box stairs, Iron Oil Oil Expo, Head Wood Wood Pyinkado, Inox Wood Pyinkado glass, stainless steel glass
box Iron gates, Oil Expo Iron boxes, square iron Oil Expo , Oil Expo Iron box, Oil Expo
wood bedroom door Industrial doors Industrial wood door wood door wood door Pyinkado Pyinkado
windows, doors (outdoor) Aluminum Iron coated glass lens 5, a 5-cup aluminum Quan Cua Dat or finishing second Euro 8mm toughened glass
doors WC (0,7mx2m) Aluminum coated plastic door Yaho, a 5-cup aluminum Quan Dat, perfection of Euro 8mm toughened glass
circular Taiwan Locks Taiwan Lock round Lock Korea, Italy Lock Korea, Italy
Ceiling Goods markets Goods market Plate Frame plate frame Vinh Tuong Vinh Tuong
Son Ha inox, Dai Thanh Toan My South American payment
faucet, Sink Full American Inax American Toto
toilet, washbasin Toto Inax American Inax
Accessories 7 items (in feet) Inax Inax American Toto
Switches, Sockets, CB ChengLi Panasonic Panasonic Clipsal
Duhal Lights, Dien Quang Philip Philip Philip, Para
D Excluding
energy HT hot water Sunflower Goods market volume Ariston Ariston
Funiki refrigeration system, Ree LG, Hitachi, Sanyo, Mitsu, Sharp Toshiba, Samsung, Pana
TB kitchen cupboard oval Manni Manni transplant White Oak 100% 100% Pyinkado
wall wood cabinet White Oak oval Manni Manni transplant Pyinkado 100% 100%
The calculation m2 building E
1. Foundation: depending on geological conditions (substrate) can cost from 40% or more over the ground floor area.
2. Basement: with expenses of 150% or more over the area.
3. Ground floor: charged 100% of area
4. Mezzanine: 100% down to the floor at the position of the remaining 70% of the area.
5. The floor: 100% of the area
6. Terrace: 100% of the area with 75% of the roof deck to rest
7. Tole roof 30%; Roof tiles are usually 50%; 70% reinforced concrete roof, concrete roof tile stickers: 100% of the
8. Fence, garden are calculated separately according to md, depending on the level of investment.
* Investors should consider: With design documents and corresponding materials, the total amount of investment will be? To avoid falling into the "matrix" calculated m2.
F Additional notes on bid packages raw materials and labor share package.
The work and would exclude wood items