2. wastewater collection systemWaste water arising in KLH include:-Waste water generated is estimated at 31, 29m3/day with the total number of officers, the staff of the KLH is 266 people.Car wash-water transport when out of the estimated 175m3 KLH/day.-Water leak arises from the Junk box buried tech number 1 and number 4 is estimated at 2000 m 3/day2.1 the system collecting waste waterDomestic wastewater generated are collected into a septic tank to preliminary processing before putting on the waste water reservoir and on the waste water treatment system (XLNT) of KLH to handle. Figure 20. Detailed drawings using a septic tank
đang được dịch, vui lòng đợi..
