In many years of work in the field of mechanical repairs, maintenance and I had a lot of experience in the job. I have been assigned to find out the causes of the B3516 model diesel generator. During that time the machine runs about 15 minutes getting error is high, the cooling water temperature and air regularly turned off prematurely. At that time, I have to work directly with departments and suppliers to find out the cause in 2 days time. I've viewed documents and plan details. I created the things I really like, and they have been I think smoothly. Then I step by step implementation of the objectives in the given time frame and try to complete them on time. I've directly operating the Group made the task quite well. You can tell that some situations is the pressure but I would think that is challenging situations and it requires me to try more to meet it.
đang được dịch, vui lòng đợi..
