ELECTRICAL LABORATORY WORK REPORT:Project: new testing and putting into operation of the Cabinet system and low-voltage distribution Cabinet Electricity works Ltd.-Wuhan KaiDi-China-Executive Office works in Quang NinhLocation: thang Long thermal power-Override E Le Loi, district of Heng Bo, Quang Ninh provinceAssembly: place the substation 3x1250 KVA-35/0.4 KV
đang được dịch, vui lòng đợi..