positioning the wall
concreting + navigation positioning wall
excavation by grab Masago
confirm the depth and dredging pit
reinforced frame and lowered his head shield wall
tremie concreting pipe
handling the pit bottom sediment
concrete poured directly from the car through the tube pouring concrete
pouring concrete extubation after the setting of concrete
đang được dịch, vui lòng đợi..
