Concrete compaction must ensure the following requirements:
- You can use different dress type used, but must ensure that after the dress, the concrete is compacted and without disabilities.
- The time at each location must dress ensure that concrete is compacted. Signs to identify compacted concrete is: cement grout float to the surface and the air bubbles are gone.
- When using a vibrator, the vibrator moves does not exceed 1.5 times the effect of semi-hermetic dress, must be plugged into the front layer of concrete is poured 10cm.
đang được dịch, vui lòng đợi..
