After the cooling time, direction lever valve lever for the clock to run out of pressure of the exhaust system (exhaust pressure operation to pay attention, to avoid mistakenly whisked open valves will make weld bung out) then remove the pipe clamp cheeks out and move the pipe has welded out of South Korea. The welding process finish
đang được dịch, vui lòng đợi..
