2.4.2.1. Sprayed evenly and intermittent compressionAt the reception, the waste was unloaded down the location specified and is made according to each class in order to calculate the balance for the entire burial box. After the garbage truck dumped the waste in floor reception, wheel loaders will push the garbage out of the parking places put to the bulldozer, bulldozer will active ironing surface area are garbage. The work of sprayed deodorant and/or kill insects that can be made at reception floor. The garbage was spread evenly and intermittent compression to maximum 50 cm thick layer over a wide operating area approximately 50 m have slope 3:2 (horizontal: vertical) until flat. Next, the car Junk lagoon will run along the entire length of the operating area, and then run back two to three rounds to ensure the maximum compression level for all spam received. The garbage is spread and compression in this way to form a high spam 5 m-class. The large garbage type be crushed or split, then taken to a lower place to airport intermittent down disposal of smaller size.
đang được dịch, vui lòng đợi..